Spec LNG recovers capacity after Cartagena outage

AI executive summary
The story at a glance, best enjoyed with a coffee ☕
The Spec LNG terminal in Cartagena resumed its maximum regasification capacity on October 31 after completing repairs on one of its trains. The fault detected on October 26 had caused programmed natural gas rationing. Repairs concluded ahead of schedule, eliminating the technical restriction.
🔔 Sign in to follow this story and get its updates.
In this story you will find
Other coverage of this story (2 sources)
Coverage radar
2 reports from 2 outlets, in publication order
Publication timeline
When each outlet published its report
- Caracol RadioCartagena regasification terminal at full capacity
- SemanaSpec LNG recovers capacity after Cartagena outage
New themes as coverage developed
Topics are AI-generated from headlines and summaries. They show what appeared in the coverage, not proof that earlier reports omitted or contradicted a fact.
- Semanaalso mentionsgas-natural · espec-lng · racionamiento
▸▾ Rate, add sources or report this story
Sign in to rate this story and add sources.
Community annexes
Coverage of this same story by other outlets, contributed by readers and checked automatically.
Ask about this coverage
Get an AI answer grounded in reports from different outlets, with links to the sources.