Pereira Invico Building Implosion After 7.4 Earthquake

Sign in to rate this story and add sources.
Community annexes
Coverage of this same story by other outlets, contributed by readers and checked automatically.

Sign in to rate this story and add sources.
Coverage of this same story by other outlets, contributed by readers and checked automatically.
The story at a glance, best enjoyed with a coffee ☕
The iconic Invico building in Pereira will be demolished through controlled implosion, an unprecedented procedure in Colombia, after being severely damaged by the 7.4 magnitude earthquake on August 10. The 15-story structure has structural faults that pose a collapse risk over Circunvalar Avenue. Engineers from Demoliciones Atila will use 180 kilograms of explosives to bring down the concrete mass that marked Pereira's history for over half a century. Technical studies concluded that the failure was caused by the construction system used in 1971, which lacked adequate seismic resistance.
ⓘ NotiControl newsroom · AI summary of reporting by El Tiempo · may change as coverage develops · how we work
Who reported it and when. Tap to read each version.
AI-generated topics: they show what appeared, not that an outlet omitted a fact.
🔒 Compare the summary of each outlet
🔔 Want updates when there’s news?
This story is still developing. 2 outlets are already covering it.
How should we let you know?
Free, with Google or your email, no passwords. You come right back here.